Soil to dig and cubes to haul away
Result
10.80
m³
to dig
- Excavated volume 10.80 m³
- Loose soil to remove 13.50 m³ +25% bulking
- In cubes 4.77 cubes
How we calculated this
- Dug volume 20 × 0.6 × 0.9 × 1 = 10.80 m³
- Loose volume 10.80 × (1 + 25%) = 13.50 m³
- Cubes 13.50 ÷ 2.832 = 4.77 cubes
Estimates are for budgeting and checking quotes, not structural design. Have a qualified engineer confirm quantities and reinforcement before building.
10.80 m³ dug · 4.77 cubes to remove
See result