Excavation

Soil to dig and cubes to haul away

Adjust assumptions
%

Result

10.80 m³

to dig

  • Excavated volume 10.80 m³
  • Loose soil to remove 13.50 m³ +25% bulking
  • In cubes 4.77 cubes
How we calculated this
  1. Dug volume 20 × 0.6 × 0.9 × 1 = 10.80 m³
  2. Loose volume 10.80 × (1 + 25%) = 13.50 m³
  3. Cubes 13.50 ÷ 2.832 = 4.77 cubes

Estimates are for budgeting and checking quotes, not structural design. Have a qualified engineer confirm quantities and reinforcement before building.

10.80 m³ dug · 4.77 cubes to remove See result